Decorating guide
Preparing a Room for Decorating: Who Does What?
Last updated
At a glance
- List included surfaces and those staying untouched.
- Discuss bulky furniture before the working day.
- Show defects rather than concealing them.
- Agree a usable route and the order of rooms.
Separate household preparation from trade preparation
Getting ready for decorating is easier when you separate two tasks: organising the household and preparing the surfaces. The decorator's filling, sanding and priming are trade work. Your decisions about belongings, access and which room can be out of use are a different part of the plan. Mixing them together can leave both sides assuming that someone else will deal with a particular item before the work begins.
The existing interior preparation guidance says Giraffe handles furniture protection, surface repairs, priming and masking. The Swindon service page also describes moving and covering furniture and protecting flooring. Those statements explain the normal decorating process, but they do not answer every practical question about an individual home. Use the quotation visit to discuss large pieces, fragile objects and the space available, so preparation is agreed rather than guessed.
Make a room-by-room brief
Before the visit, list the rooms and surfaces you want included. Walls, ceilings, doors, frames and skirting are separate parts of the brief, even when they share a room. Mention existing wallpaper and any plaster defects that you have noticed. This gives the decorator a clearer starting point than asking for a general refresh and leaving the details until the first working day.
Also record what should remain untouched. A feature wall, existing floor finish or piece of original joinery may need protection rather than redecoration. The site's quotation explanation includes assessing repairs and preparation before an itemised quote is issued. A clear list helps that assessment describe your actual plan. If you are still deciding colours or finishes, explain which choices are open rather than treating an undecided surface as excluded.
Discuss furniture and personal possessions
A furnished home creates more moving and protection work than an empty one; that is already explained in the interior painting cost page. Look at the room as a working space rather than only as a living space. The decorator needs to reach the surfaces being painted, and the furniture that stays needs an agreed position. Ask about bulky items at the visit rather than assuming that moving them is always straightforward.
Personal papers, ornaments and other belongings should be part of that discussion too. Make a list of anything you want to organise yourself and agree what should be left for the team. This guide does not introduce a blanket rule that every room must be emptied or that every object will be moved by the decorator. The sensible preparation is a shared plan based on the room and the work described in the quote.
Leave surface repairs to the agreed specification
Filling cracks, smoothing repairs and priming are not interchangeable shortcuts. The client-supplied FAQ explains that preparation can include filling, sanding and priming, depending on the job. The plastering pages distinguish repair work from skimming and explain that fresh plaster needs to dry before decoration. If you see a damaged patch, show it during the visit rather than covering it up so that the room appears ready.
Doing some preparation yourself should be discussed before you start. Ask whether your proposed work belongs in the decorator's specification and whether any further treatment will still be needed. A repaired wall may require sanding or priming before it receives a finish. Keeping those stages clear is more useful than dividing the project into an undefined DIY prep phase and a professional painting phase with an uncertain starting surface.
Understand dust control and protection
Gareth's FAQ describes dustless sanding systems as controlling dust during the process rather than leaving it to settle through the home afterwards. That is a method of preparation, not a reason to leave belongings and floor protection out of the plan. The service pages describe protection before painting and careful preparation of the surfaces. Ask how those arrangements fit the room you will still be using around the work.
If you have concerns about a particular object or area, point it out before the job is underway. A polished floor, fitted furniture or a narrow passage may affect how the working space is arranged. The aim is to agree what needs covering and where items will be kept. This does not add a promise that decorating produces no dust at all; it reflects the site's existing explanation of controlled sanding and protection.
Plan access through an occupied home
The hallway decorating page treats access as part of the job because stairs connect the home. Think about how you will move between rooms while the work is taking place, particularly if a hallway or landing is included. Tell the decorator which spaces you need to keep using. The running order should be discussed alongside the finishes so the practical plan is not separated from the decorating brief.
For larger interiors, the existing whole-house guide describes working room by room and agreeing a sequence. That does not establish a universal timetable for your property. Rooms with repairs, extensive woodwork or plastering need different preparation from simple repaints. Ask which area will be worked on first and what you should have ready for that stage, rather than clearing every room on the assumption that they will all be used together.
Do not guess drying or completion dates
A fresh coating, a repaired wall and new plaster have different requirements. The site's guidance already explains that preparation and drying affect the running order. If a deadline matters, raise it during the survey and ask for the proposed schedule. This preparation checklist deliberately gives no fixed number of days, because it cannot know your surface condition, the coatings selected or the extent of the repair work.
Similarly, avoid assuming that a freshly painted surface is ready for normal use simply because the painting step appears complete. Ask what the agreed products and planned work mean for putting furniture back and using the room. A discussion about the actual job is more useful than relying on a generic duration. Keep any access constraints and household arrangements visible in the brief so they can be considered before the work starts.
What is not automatically part of the job
The website describes decorating and associated plaster repairs, wallpapering and floor work. It does not set a universal arrangement for every household task or unrelated building alteration. If an item needs specialist attention, or you want something beyond the listed work, ask whether it is included. Do not treat a general painting quotation as confirmation that every other task in the room will be carried out.
The final check is the itemised quotation. Read the surfaces, preparation and repairs together, then raise anything that does not match your room-by-room list. Quotes are free and no-obligation, and Gareth visits to assess the work before supplying the details. Use the contact page to explain your project, and keep the existing interior service and timing guides alongside this checklist when planning what needs to be ready.
Common questions
Should I fill every crack before the decorator arrives?
Discuss repairs first. Filling, sanding and priming are already part of the preparation assessed for the decorating quote.
Must every furnished room be completely emptied?
The site describes moving, covering and protecting furniture. Agree the arrangement for your particular room instead of assuming complete clearance.
Does dustless sanding replace floor protection?
No. Dust control and covering the room are separate parts of preparing an occupied home for decorating.
What should I clarify if I want to help with preparation?
Specify the tasks you intend to do and ask what condition the decorator needs before the agreed trade preparation begins.